HomeMy WebLinkAbout2018 Franklin @ ReserveSHEET TITLE
SIGNAL NOTES
SHEET NUMBER
CR-205
I/R DATE DESCRIPTION
ISSUE/REVISION
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
10 South Jefferson Street
Suite 1600
Roanoke, Virginia 24011
540.857.3100 tel
www.aecom.com
CLIENT
CITY OF ROANOKE
Office of City Engineer
215 Church Avenue, SW
Room 350
Roanoke, VA 24011
PROJECT
REPLACEMENT OF
FRANKLIN ROAD BRIDGE
OVER NORFOLK
SOUTHERN RAILWAY
PROJECT NUMBER
60290893
AN
S
I
D
2
2
"
x
3
4
"
0 08/25/2016 Issued for Construction
SHEET TITLE
SIGNAL PLAN
SHEET NUMBER
CR-206
I/R DATE DESCRIPTION
ISSUE/REVISION
5 07/16/2018 SIGNAL CONDUIT
6 10/03/2018 ADA RAMPS
KEY PLAN
REGISTRATION
CONSULTANT
AECOM
10 South Jefferson Street
Suite 1600
Roanoke, Virginia 24011
540.857.3100 tel
www.aecom.com
CLIENT
CITY OF ROANOKE
Office of City Engineer
215 Church Avenue, SW
Room 350
Roanoke, VA 24011
PROJECT
REPLACEMENT OF
FRANKLIN ROAD BRIDGE
OVER NORFOLK
SOUTHERN RAILWAY
PROJECT NUMBER
60290893
AN
S
I
D
2
2
"
x
3
4
"
GRAPHIC SCALES
0 08/25/2016 Issued for Construction
Proposed Signals
(ALL DIMENSIONS ARE TO CENTER OF POLE)
Signal Pole & Controller Legend
JUNCTION BOX LEGEND
All Junction Boxes shall conform to
St'd. JB-S3 unless otherwise noted
on the plans.
SI
G
N
A
L
2 4 8
PHASES
2-6 FL
A
S
H
CO
M
B
.
2
G
4
G
PED 8
PED 6
NOTES:
1. BLANK BOX INDICATES RED.
2. SIGNAL TIMINGS AND CLEARANCE INTERVALS TO BE PROVIDED BY
THE CITY OF ROANOKE.
SI
G
N
A
L
S
CL
R
.
IN
T
.
30"x36"
R3-5LR3-5R
30"x36"
R3-6L
30"x36"
Proposed Signs
S-1
S-2
S-3 S-4 S-5
NOTES:
1. Signs shall conform to TE-379 and the latest version of the Virginia Standard Highway Sign
Book.
2. Signs S-6, S-7, S-8, S-9 shall be installed such that the arrows are parallel to the
corresponding crosswalk.
SIGNAL MAST ARM POLE (PF-8), TYPE IV
N 3620038.2013
E 11061190.0135
18' Luminaire Arm , 45° Angle to Franklin Rd. (See Note 2)
AEL Autobahn ATB2 Roadway Luminaire 80BLEDE10 MVOLT R4 with LED
Photocell and full cut-off, or approved equal meeting IES design criteria.
45' Arm, 90° Angle to Franklin Rd.
Signal Placements: 29', 39'
Sign Placement: 13', 43'
Emergency Preemption Detector/Confirmation Light: 33'
40' Arm, 0° Angle to Franklin Rd.
Signal Placements: 4',16', 30'
Sign Placement: 8', 12', 26'
Emergency Preemption Detector/Confirmation Light: 23'
SIGNAL MAST ARM POLE (PF-8), TYPE IV
N 3619969.3771
E 11061255.0861
18' Luminaire Arm, 45° Angle to Franklin Rd. (See Note 2)
AEL Autobahn ATB2 Roadway Luminaire 80BLEDE10 MVOLT R4 with LED
Photocell and full cut-off, or approved equal meeting IES design criteria.
50' Arm, 90° Angle to Franklin Rd.
Signal Placements: 33', 43', 48'
Sign Placement: 17', 30'
Emergency Preemption Detector/Confirmation Light: 38'
58' Arm, 0° Angle to Franklin Rd.
Signal Placements: 30', 42'
Sign Placement: 16', 48'
Emergency Preemption Detector/Confirmation Light: 36'
2- SP-8 Pedestrian Signal Heads
2- Pedestrian Push Buttons
1- S-7
1- S-9
PEDESTAL POLE (PF-2), 8'
N 3620052.8622
E 11061319.5959
PF-2 Concrete Foundation
SMB-1 One Way Hanger Assembly
1-SP-8 Pedestrian Signal Head
1-Pedestrian Push button
1-S-8
PEDESTAL POLE (PF-2), 8'
N 3620025.5730
E 11061188.6610
PF-2 Concrete Foundation
SMB-1 One Way Hanger Assembly
1-SP-8 Pedestrian Signal Head
1-Pedestrian Push button
1-S-6
CONTROLLER CABINET AND FOUNDATION (CF-1)
N 3619962.2188
E 11061266.0417
Cabinet door hinge located on right side of cabinet
when facing cabinet door
UPS Cabinet piggy back on left side of controller cabinet
Door hinge on right side of UPS cabinet
SE-5 ELECTRICAL SERVICE
N 3619965.9943
E 11061273.3496
Meter and 40 Amp Circuit Breaker Disconnect Box
72" Mounting Height
02+06
(EVP-6)
04+OL-A
(EVP-4)
(EVP-2)
1 - 3” Conduit (Stub conduit 2' up pole)
1 - 8/3c (Power)
2 - 8/2c (Lum)
1 - #8 EGC
1 - 3" Conduit
1 - 8/3c (Power)
1 - #8 EGC
1 - 4” Conduit
1 - 8/3c (Power)
8 - 14/7c (SP-8 x4, PB x4)
8 - 14/7c (Heads 2, 4, 4A, 4B, 6, 6A, 8, 8A)
1 - #8 EGC
1 - 3” Conduit
4 - EPDC
4 - 14/2c (CL)
1 - Cat 5 Cable (VDC)
1 - #8 EGC
1 - 2” Conduit (Spare)
1 - #8 EGC
1 - 3” Bored Conduit
2 - 14/7c (Head SP-8, PB)
1 - #8 EGC
1 - 2” Bored Conduit (Spare)
1 - #8 EGC
1 - 2” Conduit
2 - 14/7c (Head SP-8, PB)
1 - #8 EGC
1 - 3” Conduit
4 - 14/7c (SP-8 x2, PB x2)
4 - 14/7c (Heads 6, 6A, 8, 8A)
1 - #8 EGC
1 - 3” Conduit
2 - EPDC
2 - 14/2c (CL)
1 - Cat 5 Cable (VDC)
1 - #8 EGC
1 - 2” Conduit (Spare)
1 - #8 EGC
1 - 2” Conduit
2 - 8/2c (LUM)
1 - #8 EGC
1 - 2” Conduit
1 - 8/2c (LUM)
1 - #8 EGC
1 - 2” Bored Conduit
1 - 8/2c (LUM)
1 - #8 EGC
1 - 2” Conduit
1 - 8/2c (LUM)
1 - #8 EGC
1 - 3” Bored Conduit
2 - 14/7c (SP-8, PB)
4 - 14/7c (Heads 2, 4, 4A, 4B)
1 - #8 EGC
1 - 3” Bored Conduit
2 - EPDC
2 - 14/2c (CL)
1 - #8 EGC
1 - 2” Bored Conduit (Spare)
1 - #8 EGC
1 - 2” Conduit
2 - 14/7c (SP-8, PB)
1 - #8 EGC
1 - 3” Conduit
4 - 14/7c (Heads 2, 4, 4A, 4B)
1 - #8 EGC
1 - 3” Conduit
2 - EPDC
2 - 14/2c (CL)
1 - #8 EGC
1 - 2” Conduit (Spare)
1 - #8 EGC
Phasing Diagram
Conduit & Cable Legend
COLOR SEQUENCE CHART START CROSSING
Watch For
Vehicles
DON'T START
Finish Crossing
If Started
TIME REMAINING
To Finish Crossing
DON'T CROSS
STEADY
TIMER
FLASHING
PUSH BUTTON
TO CROSS
FRANKLIN RD.
S-6
START CROSSING
Watch For
Vehicles
DON'T START
Finish Crossing
If Started
TIME REMAINING
To Finish Crossing
DON'T CROSS
STEADY
TIMER
FLASHING
PUSH BUTTON
TO CROSS
S-7
START CROSSING
Watch For
Vehicles
DON'T START
Finish Crossing
If Started
TIME REMAINING
To Finish Crossing
DON'T CROSS
STEADY
TIMER
FLASHING
PUSH BUTTON
TO CROSS
RESERVE AVE.
S-8
FRANKLIN RD.
PED 6
4A
6
6A
G
DW
DW
G
G
G
Y
Y
DW DW W DW
DW W DW DW
START CROSSING
Watch For
Vehicles
DON'T START
Finish Crossing
If Started
TIME REMAINING
To Finish Crossing
DON'T CROSS
STEADY
TIMER
FLASHING
S-9
RESERVE AVE.
PUSH BUTTON
TO CROSS
G Y
NOTES:
1. THE CONTRACTOR SHALL VERIFY THE LOCATION OF EXISTING
UTILITIES IN THE VICINITY OF THE SIGNAL POLE FOUNDATIONS PRIOR
TO DESIGN AND FABRICATION OF STRUCTURAL ELEMENTS.
2. AEP TO INSTALL LUMINAIRE HEADS. CONTRACTOR TO PULL
CONDUCTOR FOR HOOKUP DURING CONSTRUCTION.
4B
G
G
PE
D
8
08
PED
SPECIAL
30"x36"
S-10
6
G
W
DW
G
6
6
6
6
6
6
SE-4 Service
Removed
Clearview 5-W mixed-case font
18"x96"
Clearview 5-W mixed-case font
18"x96"
added traffic arm extension for signal head to
correct line of si ht from lane lines
sidewalk removed from
reserve building cleanup
Revised location of 360
degree Camera Head to
this arm for better view
push button installed
on conduit mount to
achieve ADA access
maximum reach limit